| Trade |
FY 2025/2026 Rates |
| Base Rate |
Overtime Hours |
Markup Regular 20% |
Markup Overtime 20% |
| Project Management |
153.80 |
|
|
|
| Engineering Svc |
94.68 |
142.01 |
113.61 |
170.42 |
| Central Plant |
93.09 |
139.64 |
111.71 |
167.56 |
| Plumbing |
94.73 |
142.10 |
113.68 |
170.52 |
| Electric |
91.31 |
136.96 |
109.57 |
164.36 |
| Carpenters |
83.41 |
125.12 |
100.10 |
150.14 |
| Lock |
82.08 |
123.12 |
98.49 |
147.74 |
| Paint |
84.25 |
126.38 |
101.10 |
151.65 |
| Fleet |
85.32 |
127.98 |
102.39 |
153.58 |
| Landscape |
62.80 |
94.21 |
75.36 |
113.05 |
| Laborers |
56.26 |
84.38 |
67.51 |
101.26 |
| Custodian |
53.21 |
79.82 |
63.85 |
95.77 |
| Events |
59.86 |
89.79 |
71.83 |
107.75 |
| Solano Multi-Trade* |
91.67 |
183.34 |
110.00 |
220.01 |
| Solano Grounds* |
63.57 |
127.14 |
76.28 |
152.57 |
| Students |
20.00 |
30.00 |
24.00 |
36.00 |
* Overtime rate for International Union of Operating Engineers (Unit 10) is at 2.0%
Please note that most chargeback work is performed outside normal business hours and is subject to overtime charges including meals and labor.
| Specialized Equipment |
Rate/Hour |
Type of Equipment |
| Value greater than $100k |
$75 |
Boom truck and lift, backhoe, dump truck, forklift, vacuum trailer |
| Value between $50k-$100k |
$50 |
Mini excavator, scissor lift |
| Low value around $30K |
$25 |
Vertical lift, generator, bobcat |
FMD assesed various assets that work on projects or rented out.
Based on usage hours, asset cost, and type of work is how we derived the average cost.